# Multilingual meeting ROI worksheet Original blank worksheet with a fictional arithmetic check. This is an operational evaluation template, not financial advice or a product savings claim. ## Evaluation scope - Decision, team, meeting types, period, and sample size: - Existing tool/plan entitlement and accessible meeting capabilities: - Proposed alternative and incremental subscription or plan-upgrade cost: - Device/capture setup and missing participant audio risk: - Baseline and assisted sessions, matching method, and confounders: - Data owner and participant-consent process: - Quality criteria: decision, owner, deadline, unresolved questions: - Category boundaries to prevent double counting: ## Staff-minutes per meeting | Activity | Baseline | Assisted | Measured/assumed | Source/date | Uncertainty | |---|---:|---:|---|---|---| | Preparation | | | | | | | Clarification | | | | | | | Correction/review | | | | | | | Follow-up | | | | | | | Other non-overlapping work | | | | | | | Total | | | | | | Sum participant time. Ten minutes involving three people is 30 staff-minutes. Do not count the same activity in multiple rows. Record meeting duration separately if it is evaluated. ## Economic inputs | Input | Value | Unit | Measured/assumed/realized | Evidence | |---|---|---|---|---| | Comparable meetings per month | | meetings | | | | Net staff time released per meeting | | minutes | | | | Loaded labor rate | | currency/hour | | | | Redeployable share of released time | | 0–1 | | | | Incremental recurring software or plan upgrade | | currency/month | | | | Other recurring costs not already in staff time | | currency/month | | | | Initial setup and training | | currency | | | | Demonstrated avoided cash expenditure | | currency/month | | | | New recurring cash expenditure | | currency/month | | | ## Formulas - Net staff-minutes = baseline total − assisted total. - Capacity hours/month = net minutes × meetings/month / 60. - If net capacity hours are positive: capacity value = capacity hours × labor rate × redeployable share. - If net capacity hours are negative: labor impact = capacity hours × labor rate. Charge added work at the full rate; do not reduce it by the redeployable share. - Net economic value = capacity value (or negative labor impact) − recurring costs not already counted. - Capacity-equivalent recovery period = initial economic cost / positive net monthly economic value. If value is zero or negative, no finite recovery period under those assumptions. - Recurring cash effect = demonstrated avoided cash expenditure − new recurring cash expenditure. Do not label capacity value as cash savings. - Economic break-even minutes, with 100% redeployable share = recurring cost × 60 / (meetings × hourly rate). ## Fictional arithmetic check Baseline 480 staff-minutes; assisted 400 including additional review; net 80. Twenty meetings/month and $40/hour imply $1,066.67 capacity value. Software $300 + purchased support $100 = $400/month. Net economic value $666.67; $1,200 initial economic cost / $666.67 = about 1.8 months of capacity-equivalent recovery. With no avoided expenditure, recurring cash effect is −$400/month. Initial cash costs require their own classification. At net 20/50/80 minutes per meeting, monthly economic value after $400 cost is −$133.33/$266.67/$666.67. Economic break-even is 30 minutes. Assumes all released capacity can be redeployed and quality criteria hold; no numbers are observed results. Downside check: if assisted effort rises to 500 staff-minutes, net time is −20 minutes per meeting. Across 20 meetings at $40/hour, added labor has a −$266.67 impact even when redeployable share is zero. After $400 recurring costs, net economic value is −$666.67. ## Decision record - Comprehension and critical-field results: - Baseline/assisted distributions and missing observations: - Downside/base/upside assumptions: - Avoided cash costs actually realized: - Expand/revise/stop, rationale, owner, and review date: ## Fictional comprehension check — paired with the effort diary Source: Mara will check the drawing on Tuesday. Do not release the lot until the inspection is complete. Japanese exercise rendering: Maraが火曜日に図面を確認します。検査が終わるまで、そのロットは出荷しないでください。 No participant or translation product was tested. | Field | Fictional unreviewed answer | Source-supported reviewed answer | |---|---|---| | Action | Release the lot | Check the drawing | | Owner | Ken | Mara | | Time | Friday | Tuesday; calendar date to confirm | | Constraint | None | Do not release before inspection is complete | Assume this review is already included in the example's 40 additional AI-review staff-minutes per meeting. Do not deduct it twice. Replace that total if actual checking takes longer. Keep unresolved consequential errors visible; faster incorrect output is not a successful assisted outcome. Companion: meeting-roi-calculator.xlsx. Use three comparable baseline and assisted meetings only as an initial rehearsal to identify missing inputs, not as a sufficient sample for a rollout decision.